{
  "affected": [
    {
      "ecosystem_specific": {
        "urgency": "not yet assigned"
      },
      "package": {
        "ecosystem": "Debian:12",
        "name": "linux"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "0"
            },
            {
              "fixed": "6.1.176-1"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    },
    {
      "ecosystem_specific": {
        "urgency": "not yet assigned"
      },
      "package": {
        "ecosystem": "Debian:13",
        "name": "linux"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "0"
            },
            {
              "fixed": "6.12.94-1"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    },
    {
      "ecosystem_specific": {
        "urgency": "not yet assigned"
      },
      "package": {
        "ecosystem": "Debian:14",
        "name": "linux"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "0"
            },
            {
              "fixed": "7.0.12-1"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    }
  ],
  "details": "In the Linux kernel, the following vulnerability has been resolved:  scsi: isci: Fix use-after-free in device removal path  The ISCI completion tasklet is initialized in isci_host_alloc() (drivers/scsi/isci/init.c:496) and scheduled from both MSI-X and legacy interrupt handlers (drivers/scsi/isci/host.c:223,613).  isci_host_deinit() stops the controller and waits for stop completion, but it never kills completion_tasklet before teardown continues. A top-of-function tasklet_kill() is not sufficient here: interrupts are only disabled when isci_host_stop_complete() runs, so until wait_for_stop() returns the IRQ handlers can still requeue the tasklet. The tasklet callback also re-enables interrupts after draining completions, so killing the tasklet before the source is quiesced leaves the same race open.  Once wait_for_stop() returns, no further IRQ-driven scheduling can occur. Kill completion_tasklet there so teardown cannot race a queued tasklet running on a dead ihost. On remove or unload, the stale callback can otherwise dereference ihost and touch ihost-\u003esmu_registers after the host lifetime ends.  A UML + KASAN analogue reproduced the failure class both with no tasklet_kill() and with tasklet_kill() placed before source quiesce, and stayed clean once the kill happened after quiescing the scheduling source.  This mirrors commit f6ab594672d4 (\"scsi: aic94xx: fix use-after-free in device removal path\"), but ISCI needs the kill after wait_for_stop().",
  "id": "DEBIAN-CVE-2026-64103",
  "modified": "2026-09-14T16:47:28.115976960Z",
  "published": "2026-07-19T16:17:51.533Z",
  "references": [
    {
      "type": "ADVISORY",
      "url": "https://security-tracker.debian.org/tracker/CVE-2026-64103"
    }
  ],
  "severity": [
    {
      "score": "CVSS:3.1/AV:L/AC:L/PR:L/UI:N/S:U/C:H/I:H/A:H",
      "type": "CVSS_V3"
    }
  ],
  "upstream": [
    "CVE-2026-64103"
  ]
}