SPERS-MK1 Emergent Data: Rotational Plasma Shear

Technical Addendum: **00_Emergent_Data**

This report details the FPGA firmware update (v2.1) that enables the **Rotational Plasma Shear** mode.

Download Original PDF

Summary of Emergent Behavior: The "Twist"

The **"Twist"** is an emergent operational mode discovered through analysis of the Pentagonal Coil Array. By altering the pulse timing, the system induces **Counter-Rotating Toroidal Currents** within the plasma sphere.

**Mechanism (Phased Induction):**

**Result (Equatorial Shear):**

Secondary Benefit: Physics of Separation (The Centrifuge Effect)

The violent plasma spin ($\$ >100,000\text{ RPM}\$ $ equivalent) provides **In-Chamber Isotope Separation** based on atomic mass.

This leads to **Self-Sorting Waste** where heavy waste is ejected first via centrifugal momentum, followed by the clean Helium ash.

Acronym for Operational Steps (NIPPLE CRIPPLE)

This table summarizes the FPGA Pulse Sequence for the critical ignition and shear sequence of the "Punch, Pinch, Twist" cycle ($\text{t}=0$ to $\text{t}=60\mu\text{s}$).

Acronym Time ($\text{t}$) Action/Component Function & Outcome
N - Nucleation$\text{t}=0$**PUNCH** (PZT Acoustic Drivers)Starts **Cavitation Nucleation** ($\text{R}_{\text{max}}$).
I - Isolation$\text{t}=50\mu\text{s}$**WAIT** (Delay)**Bubble Collapse** ($\text{R}_{\text{max}} \to \text{R}_{\text{min}}$).
P - Plasma$\text{t}=55\mu\text{s}$**PINCH** (All Coils Discharge)**Plasma Ignition** ($\$10^8\text{K}\$) / Initial Power.
P - Phase-Shift$\text{t}=60\mu\text{s}$**TWIST** (Upper/Lower Coils)**Phase Shift** to induce Rotational Shear.
L - Logic(v2.1)(FPGA Logic)The software timing adjustment (Firmware v2.1).
E - Equatorial$\text{t}=60\mu\text{s}$TWISTCreates the **Equatorial Shear** plane.
C - Clockwise$\text{t}=60\mu\text{s}$TWISTUpper coils fire **Clockwise (CW)** sequence.
R - Rotation$\text{t}=60\mu\text{s}$TWISTInduces **Rotational Shear**.
I - Ion$\text{t}=60\mu\text{s}$TWISTIncreases **ion collision rate** (Burn Efficiency).
P - Probability$\text{t}=60\mu\text{s}$TWISTIncreases fusion **Probability**.
P - Power$\text{t}=55\mu\text{s}$PINCHBase load discharge for initial **Power**.
L - Logic(v2.1)(FPGA Logic)The timing logic (Firmware v2.1).
E - ElectronicsN/AFPGA ControllerThe control **Electronics** module.