Installing under sink plumbing may seem like a task best left to a professional, but with the right tools and guidance, it is a project well within the reach of a confident DIYer. This process involves connecting the water supply lines to the faucet and linking the drain assembly to establish a functional and leak-free system. Success hinges on meticulous preparation, turning off the main water supply, and understanding the specific configuration of your fixtures. A single misaligned nut or forgotten washer can lead to a costly flood, making attention to detail the most critical step of the entire process.
Essential Tools and Materials for Under Sink Installation
Before turning the first valve, you must assemble your toolkit. Working in the confined space under a sink requires the right equipment to ensure a tight seal and proper alignment. You will need basin wrenches to access stubborn nuts in tight quarters, adjustable pliers for general fittings, and a utility knife for cutting supply lines if necessary.
Additionally, you should gather plumber’s tape or pipe dope for sealing threads, a bucket to catch residual water, and flashlights or work lights to illuminate the workspace. If you are replacing an entire assembly, having the correct replacement parts on hand is vital to avoid mid-project trips to the hardware store.

Step One: Preparing the Workspace and Water Supply
The most crucial initial step in any under sink plumbing project is shutting off the water supply. Most residential setups feature dedicated hot and cold water valves located under the sink. Turn these clockwise until they are fully closed to stop the flow of water to the fixture.
To ensure the system is completely depressurized and empty, open the faucet in the sink until the water stops flowing. Placing a bucket beneath the pipes is essential, as residual water will drain from the lines and hoses. This preparation prevents messy surprises and protects your cabinets from water damage during the installation.
Identifying Connections and Layout
Before removing old components, take a moment to analyze the current layout. Trace the path of the hot and cold supply lines from the valves to the faucet and locate the drain rod connecting the sink stopper to the P-trap. Understanding this routing is essential when installing new plumbing, as it ensures the new lines fit without excessive bending or stress.

Take clear photos or sketches of the area. This documentation serves as a visual reference when reconnecting the new components, reducing the risk of back-crossing the lines or attaching the drain to the wrong port.
Step Two: Disconnecting Old Fixtures
With the water off and the area prepped, you can safely disconnect the existing plumbing. Use a basin wrench to loosen the nuts securing the supply lines to the bottom of the faucet. Carefully unscrew the lines by hand to control their removal and prevent splashing residual water. Next, disconnect the drain assembly by loosening the nuts at the P-trap connections, allowing the trap to fall into the bucket below.
Inspect the condition of the old components. If you are only replacing the faucet or the P-trap, note how the old parts were configured. This observation is invaluable when installing the new hardware, as under sink plumbing relies heavily on correct alignment to function properly.
Step Three: Attaching the New Faucet and Supply Lines
Begin the installation process by mounting the new faucet to the sink according to the manufacturer’s instructions, typically securing it from underneath the deck plate. Once the faucet is in place, attach the new supply lines. Screw the braided stainless steel lines onto the faucet’s base by hand, ensuring the washer is seated correctly. Tighten these connections securely using a basin wrench, but avoid applying excessive force that could damage the fittings.
It is critical to connect the correct lines to the correct valves. The hot water line is usually marked or colored red, while the cold is marked or colored blue. Double-checking this before tightening prevents the need to reverse the lines later, which can complicate the installation.
Step Four: Assembling the Drain and P-Trap
After the water supply is secured, turn your attention to the drain assembly. Apply plumber’s tape to the threads of the drain tailpiece—the pipe that connects the sink to the trap—and insert it into the sink hole. Secure it with a locknut and washer, using a basin wrench to tighten the connection firmly.
Next, assemble the P-trap components, including the trap arm, the curved trap section, and the waste tee. Hand-tighten all the plastic or metal fittings, then use a wrench to secure them. The goal is to create a seal that prevents leaks without overtightening, which can crack the plastic components.
Final Checks and Testing the System
With the new plumbing installed, you are ready to restore the water supply. Slowly open the hot and cold water valves under the sink and inspect the connections for any immediate drips. Simultaneously, check the drain for proper alignment and ensure water flows freely without pooling underneath the sink.
Once the supply is confirmed to be leak-free, allow the sink to fill with water and then release the plug to test the drain. Observe the P-trap to verify that water flows smoothly without leakage at the joints. If any minor leaks occur, tighten the specific fitting; if the problem persists, disassemble the joint, inspect the washer or tape, and reassemble correctly.