{
  "report_rows": [
    {
      "kpi": "Core/operating EPS",
      "prediction": "BEAT",
      "answer": "pred $0.520 vs. cons $0.515",
      "confidence": "MEDIUM"
    },
    {
      "kpi": "Regulated transmission revenue",
      "prediction": "IN-LINE",
      "answer": "pred $515M vs. cons $512.1M",
      "confidence": "MEDIUM"
    },
    {
      "kpi": "Property additions",
      "prediction": "IN-LINE",
      "answer": "pred $1.460B vs. cons $1.457B",
      "confidence": "MEDIUM"
    }
  ],
  "guide_rows": [
    {
      "kpi": "FY 2026 Core EPS (FY 2026)",
      "prediction": "LOWER",
      "answer": "guide $2.62-$2.82 vs. cons $2.775",
      "confidence": "MEDIUM"
    },
    {
      "kpi": "Data-center contracting / load outlook (2H 2026)",
      "prediction": "UNCHANGED",
      "answer": "confirmation of substantial Q1 pipeline conversion vs. no verified consensus",
      "confidence": "LOW"
    },
    {
      "kpi": "2026 capital plan (FY 2026)",
      "prediction": "UNCHANGED",
      "answer": "guide $6.0B vs. no verified consensus",
      "confidence": "LOW"
    }
  ],
  "day1_residual_pct": -0.5,
  "day1_confidence": "LOW",
  "day5_residual_pct": -1.0,
  "day5_path": "FOLLOW-THROUGH",
  "day5_rationale": "FOLLOW-THROUGH \u2014 implicit out-period cut drives estimate pressure",
  "day5_confidence": "LOW"
}