LNT Earnings Predictions — 2026-07-30

Ticker Report or Guide KPI Prediction Answer Confidence
LNT Report Q2 ongoing (non-GAAP) EPS IN-LINE pred ~$0.67 vs. cons $0.66 MEDIUM
LNT Report Q2 revenue IN-LINE pred ~$1.00B vs. cons $1.00B LOW
LNT Report Contracted data-center capacity (executed ESAs) BEAT pred ~3.4–3.8 GW vs. prior-disclosed ~3.4 GW MEDIUM
LNT Guide FY26 ongoing EPS guide (reaffirm) UNCHANGED guide ~$3.36–$3.46 (mid $3.41) vs. cons $3.42 (FY2026) HIGH
LNT Guide Long-term EPS CAGR UNCHANGED guide ~7%+ vs. cons ~7% (2027–2029; real refresh at Q3/EEI) HIGH
LNT Guide Large-load pipeline / new ESA commentary BETTER guide ~2–4 GW pipeline + potential new ESA vs. cons ~3.4 GW in-plan (2026+) MEDIUM
LNT Guide Capex / rate-base plan (EEI preview) UNKNOWN guide deferred to EEI ~$11–12B+ possible vs. cons current ~$11.5B plan (Q3/EEI Nov) LOW
LNT Return Day-1 residual (stock − beta × S&P 500) +0.5% LOW
LNT Return 5-day cumulative residual +0.0% (STABILIZE) Q2 is a small, on-plan shoulder quarter with a clean guide reaffirm and no capex/EPS reset until Q3/EEI, so there is no revisions catalyst to drive follow-through; a possible new ESA offers modest upside but the real re-rate is deferred. After an ~8% pullback from the July high (incl. −2.5% on 7/29), the setup is oversold enough to blunt downside, leaving idiosyncratic drift near flat as estimates hold pending November. LOW