Installing an above ground pool can transform a backyard into a personal oasis, providing years of family fun and relaxation. However, the very first step—digging the hole—is often the most intimidating and critical phase of the entire project. To ensure the pool remains level, stable, and visually appealing for decades, you must dig out with precision and purpose.
The goal of digging out for an above ground pool is not just to create a hole, but to create a perfectly level and compacted foundation. An uneven base is the primary cause of pool wall bulging, liner failure, and structural instability. By following a methodical process, you shift the burden from the fragile vinyl liner to the sturdy frame, which is designed to handle pressure evenly.
Planning and Measurement
Before touching a shovel, you must determine the exact footprint of your pool. Above ground pools come in specific diameters, typically 12, 15, 18, or 21 feet, so measure your kit carefully. Mark the center point with a stake and use a string line and a compass to create a perfect circle on the ground. This circle represents the outer edge of the wall track, and it is vital to adhere to this line to ensure the walls sit flush with the ground.

Accounting for Slope
It is a common mistake to assume the ground needs to be perfectly flat in every direction. For optimal drainage, you need to create a slight slope away from the pool. Dig the center of the hole to the required depth—usually about 6 inches for the sand base—and allow the depth to gradually decrease toward the outer edge. This "battered" wall approach prevents water from pooling around the base, which can lead to frost heave in winter or shifting soil under the liner.
The Excavation Process
With the circle marked, begin excavating soil from the center outward. Use a flat shovel to slice into the turf and soil, removing layers no thicker than 3 or 4 inches at a time. As you dig, pile the excavated soil around the perimeter of the hole. This excavated material will be invaluable later, as you can use it to backfill and create a stable berm around the pool to secure the walls and deter grass from growing underneath the liner.
- Remove grass, rocks, and roots to prevent punctures in the liner.
- Check depth frequently using a level board across the hole.
- Maintain the integrity of the walls by stepping in carefully.
Verification and Compaction
Once the hole is dug to the correct depth and shape, the most crucial step is verification. Lay a level across the top of the hole in multiple directions—north-south, east-west, and diagonally. The goal is to ensure that the rim line is perfectly even. If you discover low spots, use the removed soil to build them up; never add in organic material like peat moss, as it can settle and create future bumps.

After achieving perfect level, you must compact the base. If you are using sand, flood it lightly with water and let it settle, or drive a plate compactor over the base if the soil is clay-heavy. A compacted base prevents the sand from shifting when the water weight is applied, locking the pool wall into place.
Backfilling and Finalization
With the dig complete and the base verified, you are ready to install the pool wall track. Place the wall onto the base, ensuring it is centered. Before pouring the sand for the inner base, spread a layer of crushed stone or gravel around the outer edge of the hole. This rock bed acts as a French drain, allowing groundwater to flow away from the pool wall rather than building pressure against it.
Finally, backfill the area between the wall track and the dirt berm. As you shovel the excavated soil back into place, lightly tamp it down layer by layer. This compacted backfill provides the necessary resistance to hold the pool walls straight once the water is turned on. When the pool is finally filled, the balance between the lateral water pressure and the compacted earth will keep your above ground pool looking square and solid for years to come.