Above ground pools have become a popular choice for homeowners seeking to enjoy a refreshing swim without the significant investment and installation time of an in-ground model. However, the classic look of a pool sitting high on the surrounding deck can sometimes feel out of place in a landscape design. Half burying your above ground pool offers a perfect solution, blending the unit seamlessly with the grade of your yard to create a more integrated and visually appealing appearance. This approach lowers the primary viewing height, making the barrier less obtrusive, and allows for the creation of attractive sunken lounge areas around the pool deck.
Planning Your Pool’s Placement
The success of a half buried pool project begins long before the backhoe touches the ground. Selecting the correct location is critical, as this decision will be essentially permanent. You must account for the specific requirements of above ground pool installation, such as the necessary space for access ladders and equipment. Crucially, you need to factor in the planned depth of the excavation. For a standard pool that is 48 inches tall, excavating down to 24 inches will result in a final water level that is exactly at ground level, achieving the half bury effect. Always consult your pool manufacturer’s instructions regarding structural support and recommend burial depth to ensure this modification does not compromise the unit’s integrity.
Understanding Structural Integrity
Above ground pools rely on the outward pressure of the water to keep the walls rigid and stable. When you remove earth from one side, you are reducing the lateral support on that section of the wall. This creates a condition where the water pressure could cause the unsupported wall to bulge or potentially fail. To mitigate this risk, you will likely need to install additional structural support. This commonly involves placing sturdy steel wall braces or vertical support posts at regular intervals along the lowered section, transferring the water pressure load directly down to the ground and preventing horizontal shifting of the pool shell.

The Excavation and Installation Process
Once the design and structural support plan are finalized, the physical work can begin. Mark out the perimeter of the area to be excavated, ensuring it is slightly larger than the pool's overall diameter to allow room for working around the wall. Dig down to your calculated depth, creating a flat and level surface at the bottom. As you lower the pool into the prepared hole, you will gradually backfill the space between the pool wall and the excavation edge with carefully selected material. Using a layer of compactible fill like crushed stone or gravel is highly recommended, as it provides excellent drainage and creates a stable base that minimizes future settling under the deck area.
Landscaping and Final Integration
With the pool securely set and the backfill in place, the project shifts from construction to landscape architecture. The area where the pool meets the surrounding ground is the focal point of the design, and it requires careful attention. You can create a natural stone retaining wall to transition the pool wall into the earth, or use large decorative boulders to provide support and visual interest. Planting dense shrubs or ground cover along the buried edge helps to soften the lines between the pool and the yard, while also providing a lush, finished look that makes the installation appear as if it has always been part of the terrain.
| Fill Material | Drainage | Settling Risk | Best Use Case |
|---|---|---|---|
| Topsoil | Poor | High | Final landscaping after compaction |
| Crushed Stone | Excellent | Low | Primary backfill against pool wall |
| Gravel | Very Good | Medium | Intermediate layer between stone and soil |
Maintaining your half buried pool requires a proactive approach, particularly regarding the wall that is now exposed to soil and moisture. The backfill area adjacent to the pool shell can experience increased moisture, which may lead to erosion or shifting over time. Regularly inspect the perimeter after heavy rains to ensure the fill material has not washed away, and replenish it as necessary to maintain consistent support. By treating the buried section as a critical structural component rather than just landscaping, you ensure the long-term safety and aesthetic of your transformed pool.