RAMSEY COUNTY: ST. PAUL:

An Inventory of Its Contracts, Leases, and Agreements at the Minnesota Historical Society

Government Records

Expand/CollapseOVERVIEW

Creator: Saint Paul (Minn.).
Title:Contracts, Leases, and Agreements.
Dates:1864-1896.
Language:Materials in English.
Abstract:Correspondence, construction drawings, and contracts and other legal documents regarding city improvement projects, primarily street, sidewalk and sewer construction and improvements, but also including bridges, fire fighting equipment and facilities, printing, retaining walls, fencing, and improvements to city buildings.
Quantity:19.0 cubic feet (19 boxes and 1 oversize folder)
Location: See Detailed Description for shelf locations.

Expand/CollapseADMINISTRATIVE INFORMATION

Availability:

The collection is open for research use.

Preferred Citation:

[Indicate the cited item and/or series here]. Saint Paul (Minn.). Contracts, Leases, and Agreements. Minnesota Historical Society.

See the Chicago Manual of Style for additional examples.

Accession Information:

Accession number: None

Processing Information:

Catalog ID number: 990017082470104294

Appraisal Information:

Condition: Folded, in document packets; dirty, but otherwise in fairly good condition (March 1981). Boxes 1-4 have been unfolded, foldered, and inventoried.


Return to top

DETAILED DESCRIPTION

LocationBox
105.G.5.1B1 1864-1896:
Street Lamps, Steam Engine, Printing, Road Construction, Engine House and Bridge.
1870-1871:
Bridge, Sewer, Engine House, Printing and Sidewalks, 1870.
Grading Dayton Avenue, Sidewalks for Ronda and Jay Streets, and Engine House, 1871.
1872:
Printing Contract with St. Paul Daily Press, August 9, 1872.
St. Paul Gas Company.
Grading and Bridging of Seventh Street, June 26, 1872.
Building Sidewalks, July 3, 1872.
Building Sidewalks, July 9, 1872.
Building Sidewalks, July 10, 1872.
Dig Tunnel at Fifth Street and Market Street, July 10, 1872.
Sidewalk Construction, July 13, 1872.
Grading and Bridging Mississippi Street from Nash Street Northerly to City Limits, July 16, 1872.
Building Sidewalks, July 17, 1872.
Grading Western Avenue from Summit to Dayton Avenue, July 17, 1872.
Steam Fire Engines.
Building Sidewalks, July 25, 1872.
Building Sidewalks, July 25, 1872.
Build Fountain in Rice Park, July 29, 1872.
August-November 13, 1872:
Sidewalk Construction, August 16, 1872.
Grading and Bridging of Carroll Street, August 26, 1872.
Stone Gutter on Dayton Avenue, also on Fourth Street, September 18, 1872.
Sidewalks in St. Paul Proper, Bazille’s, Irvine’s Enlarg(ement), and Rice and Irvine’s Additions, September 21,1872.
Grading Iglehart Street from Wabasha to Rice Street and Grading College Avenue from Third to Cedar Street, October 4, 1872.
Grading of Various Streets, October 3, 1872.
Bond, John Scanlan, October 17, 1872.
Grading Tilton from St. Peter to Wabasha Street also Fifth Street from Robert to Jackson, October 19, 1872.
Bridge across Mississippi River at Wabasha Street, October 19, 1872.
Grading Randolph Avenue from Stewart Street to West Line of City; also Grading Grace Avenue, November 2, 1872.
Grading Mulberry Street from Third Street to North Eastern Terminus, November 2, 1872.
Plank sewer on Rondo Street, November 13, 1872.
December 1872:
Dayton Avenue Stone Gutters, November 16, 1872.
Fire Cistern Corner of Farrington and Dayton Avenues, December 1, 1872.
Grading Sibley and Third Streets, Wacouta and Third Streets, and Rosabelle and Third Streets, December 11, 1872.
Grading Summit Avenue from Rice to Dale, Fifth Street from Franklin to Third Street, and Oak Street from Chestnut to Sixth Streets, 1872, 1873.
Seventh Street Grading and Bridging, 1872, 1873.
February-April 1873:
Agreement Concerning a Party Wall on Property, February 4, 1873.
Construct Sewer on Public Market Ground, February 15, 1873.
Installation of Fire Alarm Signals, April 8, 1873.
Main Sewer on Minnesota Street from Mississippi River to Ninth Street, April 8, 1873.
Sidewalks in St. Paul Proper, Dayton, Irvine’s, Robert and Randall’s Additions, April 12, 1873.
Steps from Third to Hill Streets, April 17, 1873.
Construction of Steps on Washington Street from Third to Hill Streets, April 17, 1873.
May 1-May 26, 1873:
Rebuilding St. Paul Bridge, May 6 1873.
New Engine House, May 6, 1873.
Grading of Virginia Avenue, Nina Avenue, Goodrich Avenue, Hokes Avenue Farrington Avenue, May, June, August 1873.
Grading Virginia Avenue from Summit to Dayton Avenues Farrington Avenue from Summit to Dayton Avenues, Hake’s Avenue from Western to Nina Avenues, Nina Avenue from Summit to Selby Avenues, May 12, 1873.
Sidewalks in Various Areas of St. Paul, May 22, 1873.
Sidewalks Built in St. Paul Proper, May 23, 1873.
Grading Third Street from Broadway to St. Paul Railroad Track, May 26, 1873.
May 27-31, 1873:
Grading Minnesota Street from Seventh Street to Eighth Street and Eighth Street from Minnesota Street to Jackson Street, May 27, 1873.
Grading Second Street from Wabasha to Jackson and Robert Street from Second Street to Third Street, May 27, 1873.
Grading Cedar, Minnesota Seventh, Ninth, Tenth, Eleventh and Twelfth Streets, May 28, 1873.
Main Sewer on Sherman Street from East Side of Railroad to Ramsey Street, May 28, 1873.
Main Sewer on St. Peter Street from Mississippi River to Ninth Street, May 28, 1873.
Grading Summit Avenue from Rice to Wabasha Street, May 31, 1873.
June 2-4, 1873:
Grading Goodrich Avenue from Western Avenue to Front Street, June 2, 1873.
Grading Minnesota, Robert, Eight, Ninth, Tenth, Eleventh, and Twelfth Streets, June 2, 1873.
Grading Minnesota, Cedar, Fourth, Fifth, and Sixth Streets, June 2, 1873.
Main Sewer on Eagle Street from Mississippi River to Seventh Street, June 4, 1873.
Grading Robert, Fourth, Fifth, Sixth, Seventh, and Minnesota Street, June 4, 1873.
June 16-27, 1873:
Grading Wilkin Street from Stewart Avenue to Fort Street, June 16, 1873.
Labor and Materials Contract, Pine City Lumber Co., June 17, 1873.
Estimates for Grading Minnesota and Eighth Street, June 20, 1873.
Estimates for Grading Broadway from Mississippi River to Grove Street, June 20, 1873.
Grading Ramsey Street from Summit Avenue to Wilkin Street, June 25, 1873.
Sidewalks in Various Parts of St. Paul, June 27, 1873.
July 1, 1873:
Grading Hoffman Avenue from Seventh Street Bridge to Southern Terminus of Hoffman Avenue, July 1, 1873.
Eagle Street Sewer, July 1, 1873.
Grading Broadway from the Mississippi River to the North Line of Grove Street, July 1, 1873.
July 8-11, 1873:
Grading Fort Street from Richmond to Oneida Street, July 8, 1873.
Construction of an Iron and Wood Fence Around Irvine Park, July 5, 1873.
Lateral Sewer on Third Street from Broadway to Minnesota Streets, July 11, 1873.
Grading Cedar, Seventh, Ninth, Tenth, Eleventh, Twelfth Streets, July 11, 1873.
Estimates on Sherman Street Sewer from East Side of Railroad to Ramsey Street, July 11, 1873-January 31, 1874.
Grading Wilkins Street from Stewart Avenue to York Street, July 11, 1873.
Grading Third Street from Broadway to the St. Paul and Pacific Railroad, July 11, 1873.
July 12-25, 1873:
Main Sewer on Third Street from Seventh to Pleasant Avenue, July 12, 1873.
Grading Rosabelle, Wacouta, and Sibley Streets, July 15, 1873.
Grading of Hoffman Avenue, July 15, 1873.
Main Sewer on St. Peter Street from Mississippi River to Ninth Street, July 18, 1873-January 8, 1874.
Grading Minnesota, Robert, Eighth, Ninth, Tenth, Eleventh and Twelve Streets, July 20, 1873.
Grading Fort Street Between Richmond and Oneida, July 25, 1873.
Sidewalks in Various Additions of St. Paul, July 25, 1873.
August 1873:
Sidewalks on Lafayette Avenue, August 1, 1873.
Grading of Second and Robert Streets, August 7, 1873.
Grading, Curbing and Paving Third Street Between Seven Corners and Sibley Streets, August 8, 1873.
Retaining Wall on Third Street Between Market and St. Peter Street, August 8, 1873.
Lateral Sewer on Jackson Street from Third to Ninth Street, August 25, 1873.
Retaining Wall on South Side of Third Street Between Market and St. Peter Streets, August 29, 1873.
Partial Grading of Summit Avenue from Dale to Lexington, August 30, 1873.
September 8-12, 1873:
Grading Dayton Avenue from Arundel to Kent Streets, September 8, 1873.
Curbing Third Street from Sibley Street to Seven Corners, September 12, 1873.
Building Sidewalks in Various Additions of St. Paul, September 12, 1873.
Main Sewer on Third Street from Seventh Street to Pleasant Avenue, September 12, 1873.
Lateral Sewer on Jackson Street from Third Street to Ninth Street, September 12, 1873.
Grading on Cedar, Fourth, Fifth, Sixth Streets, September 12, 1873.
Estimates for Lateral Sewer on Third Street from Broadway to Minnesota Street, September 1873-July 1874.
Estimates on Broadway Sewer, September 12, 1873-May 18, 1874.
LocationBox
105.G.5.2F2 September 27, 1873-November 1873:
Curbing Third Street, September 27, 1873.
Sidewalks for Various Streets, September 27, 1873.
Main Sewer on Port Street from Seventh Street to Rice Street, September 27, 1873.
Grading Summit Avenue from Dale to Lexington, September 27, 1873 and Grading Summit Avenue Below Rice and Wabasha, July 5, 1873.
Grading McBoal Street Between Wilkins and Fort Street, October 10, 1873.
Curbing Done on Third Street from Fort Street to Sibley, October 10, 1873.
Grading Dayton Avenue, October 17, 1873.
Painting Iron Fence at Irvine Park, October 21, 1873.
Curbing Done on Third Street from Fort Street to Sibley Street, October 31, 1873.
Dayton Avenue Cistern, November 14, 1873.
Curbing Done on Third Street from Fort Street to Sibley, November 14, 1873.
1873-1874:
Curbing, Paving and Grading on Third Street, 1873-1874.
Main Sewer from Mississippi River on Broadway, Mississippi, Nash, DeBow, Olmstead, Somerset and Thirteenth Streets, 1873-1874.
Estimates in Regard to Minnesota Street Sewer, 1873-1874.
Main Sewer on Fort and Tenth Streets, 1873-1875.
January 1874-August 18, 1874:
Constructing Wooden Culvert and Open Drain on Western Avenue Between Summit Avenue and Goodrich Avenue, January 2, 1874.
Printing and Binding Work, January 14, 1874.
Contract for Supplying Hose, February 9, 1874.
Grading Seventh Street from Margaret Street to the East Line of the City, April 6, 1874.
Cistern on the Corner of Fort and Goodrich Streets, April 29, 1874.
Agreement for Services of Henry J. Horn, May 20, 1874.
Sewer on Seventh Street between St. Peter and Wabasha Streets, May 25, 1874.
Contract for Alterations to Building Known as the Baldwin School House, June 1, 1874.
Constructing Sidewalks on Rice, Wilkin, Seventh, Ninth, Twelfth and Pearl Streets, June 16, 1874.
Claim Against the First Ward Engine House, June 20, 1874.
Construction of a Sand Rock Sewer on Fifth Street, July 29, 1874.
Grading Walnut Street from Exchange Street to Irvine Park, August 17, 1874.
Grading Third Street between Broadway and Railroad, August 3, 1874.
Draining of Third Street from Fort to Wabasha Street, August 18, 1874.
August 28, 1874-October 1874:
Construct Unfinished Portion of Main Sewer on Broadway Street from Mississippi River to Mississippi Street to..., August 28, 1874.
Pave and Curb Robert Street from Third to Seventh Streets, September 21, 1874.
Grade Mississippi Street from Pennsylvania Avenue to Glencoe Street, September 21, 1874.
Sidewalks on Seventh Street, Rosabel Street and Many Other Streets, September 21, 1874.
Sidewalks on Seventh Street, Rosabel Street and Sixth Street, October 14, 1874.
January-July 21, 1875:
Agreement between City of St. Paul and H. P. Hall, Proprietor of St. Paul Dispatch, January 1, 1875.
Agreement with Henry J. Horn, Attorney for Services Rendered, January 1, 1875.
Contract for New Fire Hose, February 27, 1875.
Agreement for Lumber to be Furnished by Isaac Staples, May 1875.
Agreement to Re-Shingle the Public Market Building, May 22, 1875.
Construction of Sidewalks on Various Pieces of Property, May 21, 1875.
August 6, 1875-October 1875:
Sewer on Bonfil Street from Fort Street to Western Avenue, August 6, 1875.
Contract for a Trial Use of a Fire Hose from B. F. Goodrich & Co., August 27, 1875.
Sewer on Third Street between Wabasha and Market Street, September 10, 1875.
Contract for Coal, September 16, 1875.
Partial Grading of Isabel Street between Mississippi and Dakota Avenue, September 24, 1875.
Paint Piers of St. Paul Bridge 1 and 2 and Rebuild 3, October 8, 1875.
Grading of Third Street South from Jackson Street to Canada Street, October 16, 1875.
Contract for Fire Engine Hose, October 19, 1875.
November 1875-June 1876:
Sidewalks at Various Localities, November 6, 1875.
Grade Sibley Street from Fourth to Eighth Street and Fourth Street from Broadway to North Pacific Railroad Company, November 19, 1875.
Sidewalks in Front of DeBow, Smith, Risgue and Williams Addition, November 19, 1875.
Agreement with St. Paul Dispatch, February 3, 1876.
Contract to Build Span of a Bridge, February 5, 1876.
Contract for Constructing a Shed Around Market Grounds at Wabasha and St. Peter Streets, March 4, 1876.
Agreement to Purchase Lumber from H. J. Taylor & Co., May 12, 1876.
July-December 1876:
Complete Grading on Mississippi Street between Glencoe and Grove Streets, August 15, 1876.
Complete Grading on Sibley Street and Fourth Street, July 21, 1876.
Install Globe Gas Fixtures, September 14, 1876.
Agreement for Anthracite Coal, October 26, 1876.
Contract for Plastering Walls and Ceilings of Engine House No. 2, October 28, 1876.
Agreement to Supply Illuminating Gas for Street Lights, December 27, 1876.
LocationBox
105.G.5.4F4 January 1877-April 9, 1877:
Contract of Bond from City Print to The City of St. Paul, January 4, 1877.
Rip-Rapping on the West End of the Island, January 19, 1877.
Grading Minnesota Street from Ninth Street to Tenth Street, March 9, 1877.
Repairs to Baldwin Schoolhouse, April 3, 1877.
Agreement with West St. Paul and St. Paul, April 17, 1877.
Grade Sixth Street from Jackson Street to Broadway, April 9, 1877.
April 9, 1877-June 1, 1877:
Sidewalk Construction, April 9, 1877.
Grading Collins Street from Lafayette Avenue and Bedford Street, April 9, 1877.
Sewer on Pleasant Avenue from 3rd Street to Chestnut and Walnut Street, April 9, 1877.
An Agreement between the City of St. Paul and B. F. Goodrich of Akron for a Fire Hose, May 2, 1877.
Grade Nelson Avenue from Summit Avenue to Western Avenue, June 1, 1877.
June 6, 1877-June 28, 1877:
Sewer from Baldwin Schoolhouse to Market Street, June 6, 1877.
St. Paul and Mendota Road from Railroad Crossing to Hilltop, June 7, 1877.
Grade Fifth Street and Neil Street, July 12, 1877.
Cistern on the Corner of Farmington Avenue and Selby Avenue, June 28, 1877.
July 13, 1877-August 13, 1877:
Grade Isabel Street from Mississippi Avenue to Dakota Avenue, July 13, 1877.
Grading of Dodd Road, July 27, 1877.
Grade Rice Street from Bianco Street to Sycamore Street, August 13, 1877.
Grade University Avenue from Rice Street to Lexington Avenue, August 13, 1877.
August 13, 1877-September 7, 1877:
Grading Burdetts Hill on St. Paul and Mendota Road, August 13, 1877.
Sidewalk Contracts, August 29, 1877.
Contract for Fuel, September 4, 1877.
Contract for Wood, September 4, 1877.
Grading Fifth Street from Hoffman Avenue to Maria Avenue, September 7, 1877.
Grading Fourth Street from Hoffman Avenue to Maria Avenue, September 7, 1877.
September 8, 1877-October 6, 1877:
Grading Sycamore Street from Rice Street to Courtland Street, September 8, 1877.
Bridge on Bertha Street in the Sixth Ward of the Foot of the Bluff, September 20, 1877.
Grade Kittson Street from Seventh Street to Fourth Street, October 6, 1877.
Grade North Street and Burr Street, October 6, 1877.
October 10, 1877-December 18, 1877:
Grade Bedford and Bradley Streets, October 10, 1877.
Sidewalk Contract, November 15, 1877.
Sidewalk Contract, November 15, 1877.
Sewer on Robert Street, December 14, 1877.
Contract with Globe Gas Light Company, December 18, 1877.
January 19, 1878-February 26, 1878:
Contract between the City of St. Paul and Harlan P. Hall Publisher and Proprietor of St. Paul Globe Newspaper, January 19, 1878.
Grade Ackwright Street from Lafayette Avenue to Minnehaha Avenue, February 12, 1878.
Sewer on St. Peter Street and Tenth Street from Ninth Street to Fort Street, February 26, 1878.
Grade Ohio Street and Cabot Street, February 26, 1878.
April 8-28, 1878:
Sewer on Sixth Street between Wabasha and Minnesota Street, April 8, 1878.
Grade Exchange Street from Wabasha Street to Cedar Street, April 8, 1878.
Construction of a Cistern on the Corner Rice Street and Viola Street, April 8, 1878.
Contract for the Lyman Dayton’s Addition, April 25, 1878.
Sidewalk Contract, approximately April 28, 1878.
May 13-18, 1878:
Bridge and Grading of East John Street, May 13, 1878.
Grade the Dodd Road, May 15, 1878.
Sewer on Tenth Street and Rondo Street from Fort Street to Rice Street, May 18, 1878.
May 28, 1878-June 13, 1878:
Grade Carroll Street from Western Avenue to Mackubin Street, May 28, 1878.
Grade Rice Street from College Avenue and Iglehart Street, May 28, 1878.
Sewer on Ninth Street from Temperance Street to Broadway, June 13, 1878.
Grade Bates Avenue from Fourth Street to Seventh Street, June 13, 1878.
June 22, 1878-August 12, 1878:
Sewer on Tenth Street from Jackson Street to Broadway, June 22, 1878.
Sidewalk Contract, June 22, 1878.
Grade Charles Street from Rice Street to Dale Street, July 26, 1878.
Grade Selby Street from Summit Avenue to Western Avenue, August 12, 1878.
September 7-26, 1878:
Grade Como Avenue from Rice Street to Lake Como, September 7, 1878.
Sidewalk Contract, approximately September 7, 1878.
Grade Willius Street from Seventh to Fourth Street, September 25, 1878.
Summit Avenue Sewer from St. Peter Street to Rice Street, September 26, 1878.
October 1878:
Contract with Akron Rubber Works for Fire Engine Hose, October 1878.
Grade L’Orient Street from Glencoe Street to Pennsylvania Street, October 8, 1878.
Grade, Pave and Curb Jackson Street from Fourth Street to Seventh Street, October 15, 1878.
Grade Lafayette Avenue from Grove Street to Collins Street, October 21, 1878.
November 7-18, 1878:
Contract with H. L. Saroni for Light Oil Street Lamps, November 7, 1878.
Contract with Smith and Lewis to Furnish the City with Fuel, November 7, 1878.
Sewer on Ninth Street from Robert Street to Jackson Street, November 15, 1878.
Paving of Jackson Street, November 18, 1878.
St. Peter Street Sewer, November 18, 1878.
November 25, 1878-December 16, 1878:
Sewer on Wabasha Street from Seventh Street to College Avenue, November 25, 1878.
Sewer on Ninth Street from Wabasha Street to Cedar Street, November 25, 1878.
Sidewalks as per Advertisement, December 16, 1878.
December 9, 1878:
Sewer on Fort Street from Eagle Street to McBoal Street, December 9, 1878.
[Box part empty].
LocationBox
105.G.5.3B3 January-May 19, 1879:
Printing Contract, January 11, 1879.
Bridge on Dodd Street between Fourth and Fifth Streets, February 6, 1879.
Grading Western from Dayton Avenue to Como Avenue, April 21, 1879.
Grading Park Avenue from Bluff Street to Sycamore Street, April 21, 1879.
Sewer on Third Street from Minnesota to Wabasha Street, May 14, 1879.
Sewer on Sixth Street from Minnesota to Robert Street, May 14, 1879.
Grading Mackubin Street from Dayton Avenue to University Avenue, May 14, 1879.
Grading Harriet Street from Martin to University Avenue, May 19, 1879.
May 20-October 1879:
Grading Cedar Street from Ninth Street to Tenth Street, May 27, 1879.
Lumber Contract, June 17, 1879.
Sidewalks on Various Streets, June 24, 1879.
Agreement between William and Rosa Lindike, the City of St. Paul and the County of Ramsey, June 27, 1879.
Cistern Corner of Maria Avenue and Fifth Street, July 25, 1879.
Grading Alley in Block 27 of St. Paul Proper, August 25, 1879.
Construction of a Stonewall on the Capitol Grounds on Cedar Street, October 6, 1879.
Contract to Furnish Bricks by William A. Van Slyke to City of St. Paul, October 7, 1879.
November 1879-May 1, 1880:
Sidewalks on Sherman, Bedford, Decatur, Fourth, Ronda and Jackson Streets, October 23, 1879.
Renewing Contract with Herman S. Saroni to Light City with Oil Lamps, November 18, 1879.
Market House Contract, December 10, 1879.
Agreement with St. Paul Gas Light Company and the City of St. Paul, January 6, 1880.
Agreement with St. Paul Globe and the City of St. Paul, January 8, 1880.
Grade Burr Street from Whitall Street to Minnehaha Street, May 1, 1880.
May 24-June 1880:
Fifth Ward Sewer Contracts, May 24, 1880.
Grade Rondo from Mackubin to Western Avenue, May 31, 1880.
Grade Ally Block 31 between Jackson Street and Roberts Street, June 9, 1880.
Sewer on Eighth Street from Temperance Avenue to Broadway, June 15, 1880.
Agreement to Furnish Lumber for City of St. Paul by John Martin and Company, June 25, 1880.
July-August 12, 1880:
Grade and Culvert Fort Street from Erie Street to Oneida Street, July 13, 1880.
Sidewalk Contracts for Various Areas, July 13, 1880.
Sewer on Eighth Street and Cedar Street, August 10, 1880.
Grading of Mt. Airy Street from Fairview to Broadway, August 12, 1880.
August-October 12, 1880:
Sewer on Minnesota Street from Ninth to Eleven Street and on Eleven Street from Minnesota Street to Cedar Street, August 1880.
Sidewalk Contracts for Various Street, October 1, 1880.
Sewer on Exchange Street, Sherman Street to Eagle Street, October 1, 1880.
Sewer on Sibley Street from Third Street to Fourth Street, October 1, 1880.
Agreement with John McClure and the City of St. Paul of Furnish Asphalt Blocks, October 12, 1880.
Agreement with Champion Stone Quarries and the City of St. Paul to Furnish Flagstone, October 12, 1880.
October 15-November 16, 1880:
Grade Josette Street from Dayton Avenue to Martin Street, October 15, 1880.
Agreement with Herman S. Saroni and the City of St. Paul for Lighting of Street Lamps, October 18, 1880.
Grade Louis Street from Nelson Avenue to Rondo Street, October 29, 1880.
Grading Bluff Street from Robert Street to St. Peter Street, October 29, 1880.
Contract to Furnish Gas Fixtures for the New Market House, November 16, 1880.
[Box part empty].
LocationBox
105.G.5.5B5 1881.
LocationBox
105.G.5.6F6 1881–1882.
LocationBox
105.G.5.7B7 1882.
LocationBox
105.G.5.8F8 1883.
LocationBox
105.G.5.9B9 1883.
LocationBox
105.G.5.10F10 1883–1884.
LocationBox
105.G.6.1B11 1884.
LocationBox
105.G.6.2F12 1885.
LocationBox
105.G.6.3B13 1885.
LocationBox
105.G.6.4F14 1885.
LocationBox
105.G.6.5B15 1886.
LocationBox
105.G.6.6F16 1886.
LocationBox
105.G.6.7B17 1886.
LocationBox
105.G.6.8F18 1887.
LocationBox
105.G.6.9B19 1887–1896.
Location
114.G.4.2F-2Plans for Sewers, approximately 1870s.
Originally found scrunched up with miscellaneous materials from 1866-1872. Unknown which contract file, if any, they belong with.

Expand/CollapseRELATED MATERIALS

Drawings of Ramsey County Courthouse/City Hall, approximately 1884. 9 items. Originally found scrunched up with miscellaneous materials from 1866-1872. Transferred to: Ramsey County: Joint Court House and City Hall Committee: Court house construction records.

Return to top

Expand/CollapseCATALOG HEADINGS

This collection is indexed under the following headings in the catalog of the Minnesota Historical Society. Researchers desiring materials about related topics, persons or places should search the catalog using these headings.

Topics:
Bridges -- Minnesota -- Saint Paul.
Civic improvement -- Minnesota -- Saint Paul.
Fire extinction -- Equipment and supplies -- Minnesota -- Saint Paul.
Municipal buildings -- Maintenance and repair -- Minnesota -- Saint Paul.
Sewerage -- Minnesota -- Saint Paul.
Streets -- Minnesota -- Saint Paul.
Document Types:
Contracts

Return to top