Hardwiring low voltage under cabinet lighting transforms a simple task into a professional-grade project that delivers consistent, high-performance illumination. Unlike plug-in systems, this method integrates the fixtures directly into your home’s electrical infrastructure, creating a seamless and permanent solution for task lighting.

The core principle involves running line voltage wiring from a standard wall circuit to a low voltage transformer, which then feeds the LED strips or puck lights. This approach eliminates the clutter of cords dangling beneath cabinets and ensures a clean, minimalist aesthetic. For the DIY enthusiast or the meticulous homeowner, understanding the step-by-step process is essential to achieving a result that is both safe and visually flawless.

Planning Your Layout and Gathering Components
Before touching a wire, meticulous planning is the single most critical factor in a successful installation. Measure the total length of cabinetry to determine the required wire runs and the location of the transformer. It is often most effective to centralize the transformer in a basement, attic, or crawl space to minimize voltage drop and wire visibility.

You will need specific materials to ensure compatibility and safety:
- LED low voltage under cabinet light strips or puck lights
- A compatible constant voltage transformer
- Appropriate gauge wire for the system (typically 12 or 14-gauge for line voltage)
- Low voltage wire connectors or crimped splice connectors
- A junction box for safe connections
- Basic tools including a voltage tester, wire strippers, and a drill

Running the Line Voltage Wiring
The next phase involves safely extending power from an existing circuit to the transformer location. Turn off the circuit breaker at the main panel and verify the power is dead with a non-contact voltage tester. Route the line voltage wire through studs and floor joists using approved methods, such as threading through bored holes or utilizing existing chases, always securing the cable properly to meet electrical code.
At the point where the low voltage system begins, install a proper junction box. This box houses the critical connection where the high voltage is converted to low voltage. Connect the line voltage wires to the matching terminals on the transformer, ensuring the connections are tight and enclosed within the junction box to meet safety standards.

Connecting the Low Voltage System
With the transformer energized (with the cabinet lights disconnected), you will connect the corresponding low voltage wires to the lighting fixtures. The transformer’s output wires—typically one solid color and one striped or different color—must be matched precisely to the positive and negative leads of the under cabinet lighting.
Use low voltage connectors designed for the specific wire gauge. For a durable connection, strip the insulation, twist the strands tightly, and secure them with a connector. It is vital to maintain consistent polarity; connecting these wires backward can cause the LEDs to malfunction or fail prematurely.

Mounting the Fixtures and Final Testing
Once all connections are secure and neatly packed into the junction box, you can mount the fixtures under the cabinets. For puck lights, mark and drill the holes precisely, ensuring they are centered on the cabinet face. For light strips, verify the cleanest path for the wire and adhere the strips using the manufacturer’s approved mounting tape.



















After physically installing the fixtures, restore power at the breaker and perform a final test. Gradually check each fixture for proper operation. If you encounter issues like dimming at the end of the run, it indicates a voltage drop, which may require you to use a thicker gauge wire for the low voltage circuit or relocate the transformer closer to the center of the lighting run.