One of the primary tools that an estimator has is understanding the geometry of a building.

00:08.120 --> 00:12.360
The first thing that I do when it comes to a quantity takeoff is I first validate the

00:12.360 --> 00:14.400
scales and make sure they're correct.

00:14.400 --> 00:19.360
In reference to the plans, note that if you're inside of the main house and you're walking

00:19.360 --> 00:26.040
into this new guest room and music room, this is the image that you would see as an elevation.

00:26.040 --> 00:30.760
So we have the curved roof, we have the width of the music room, we have the structure

00:30.760 --> 00:31.920
beneath it.

00:31.920 --> 00:38.240
But beyond it, there are plaster walls that have not been identified with this section.

00:38.240 --> 00:42.480
As good as the drawings are, it didn't take into account that the estimator might not

00:42.480 --> 00:47.160
actually see that there's plaster that's going to occur on that side of the building

00:47.160 --> 00:49.640
around the music room.

00:49.640 --> 00:54.480
So what you see in this image is there's additional takeoff information that's not shown

00:54.560 --> 00:56.760
on the actual drawings themselves.

00:56.760 --> 01:02.360
Since it doesn't have an elevation, I needed to identify the total area of plaster on the

01:02.360 --> 01:05.280
exterior of the building that was not shown in an elevation.

01:05.280 --> 01:11.160
Also at the very top, notice that it's a bit darker, I have another takeoff, and that's

01:11.160 --> 01:13.920
for the other side of the parapet.

01:13.920 --> 01:19.560
My task here is to find out how many square yards of plaster is there, whether it's shown

01:19.560 --> 01:20.880
or not.

01:20.960 --> 01:25.840
I refer to these as hidden conditions, and even if it's not identified in an architectural

01:25.840 --> 01:32.040
set of drawings, it's important that the contractor or the estimator still pick these up.

01:32.040 --> 01:35.320
It's our responsibility as estimators to make sure that we have every square foot of

01:35.320 --> 01:37.920
every finish, every surface area covered.

01:37.920 --> 01:42.760
So in this case, I took it upon myself to quantify those areas, whether the architect

01:42.760 --> 01:44.800
provided them for me or not.

01:44.800 --> 01:49.360
If they're not provided for whatever the reason may be, it's still a responsibility of

01:49.400 --> 01:54.560
the estimator to quantify everything required to build that project at a given price.

01:54.560 --> 01:58.960
I had to go through a number of certain drawings, including a floor plan, to identify what

01:58.960 --> 02:02.320
the total width of that elevation of that view might be.

02:02.320 --> 02:06.960
On the same floor plan, I identified the width of the walls to the left and to the right

02:06.960 --> 02:08.120
of the bridge.

02:08.120 --> 02:12.360
I had to look at similar elevations to find out how tall the walls were and where they

02:12.360 --> 02:13.520
meet the ground.

02:13.520 --> 02:17.960
This was tricky because the slope of the ground changes from view to view.

02:17.960 --> 02:22.200
So it's a combination of looking at other sections that might offer more information.

02:22.200 --> 02:26.040
If you look at the Long Tutorial section where it goes through the entire music room,

02:26.040 --> 02:30.680
restroom addition into the house, you'll quickly identify what the overall height is going

02:30.680 --> 02:31.840
to be.

02:31.840 --> 02:35.800
You could relate the parapet in this elevation right here that you see at the top of

02:35.800 --> 02:41.480
the room with a detail that's also being utilized for the other three sides.

02:41.480 --> 02:46.560
It's safe to assume that the parapet would be no different on this side of the building

02:46.560 --> 02:52.920
and therefore plaster on the inside of the parapet on the roof itself should be quantified

02:52.920 --> 02:55.360
as the other three sides.

02:55.360 --> 03:00.480
That in itself will give you a number of options to choose from to come up with the overall

03:00.480 --> 03:02.680
quantities required.

03:02.680 --> 03:06.840
So even a construction set of documents may not have all the information required.

03:06.840 --> 03:10.240
Now technically you could reach out to the architect and say, hey Mr. Architect, could

03:10.240 --> 03:13.160
you go ahead and provide me an elevation for this?

03:13.160 --> 03:17.080
Or you could go ahead yourself and actually figure out what's going to be required.

03:17.080 --> 03:22.160
This will speed up the entire process of your estimate and not have to put it aside and

03:22.160 --> 03:25.840
wait for a response to come back from your architect.

03:25.840 --> 03:30.480
Understand that as we mentioned earlier with estimates or with estimating, it is an assumption

03:30.480 --> 03:34.720
based on the information available at the time that you build the estimate.

03:34.720 --> 03:39.040
So even though it's not drawn, it's not shown there's too many other items within the

03:39.040 --> 03:44.240
drawings themselves that clearly spell out what's going to be required for this elevation.

03:44.240 --> 03:49.840
So take it upon yourself as an estimator to quantify the areas that are still not shown.

03:49.840 --> 03:55.120
Bottom line is it's a quantification that is identified throughout the entire project

03:55.120 --> 03:58.480
even if this one elevation doesn't provide what you need.