Installing USG Durock Cement Board: A Comprehensive Guide
Embarking on a tiling project? USG Durock cement board is an excellent choice for a durable, long-lasting substrate. This guide will walk you through the process of installing USG Durock, ensuring a solid foundation for your tile installation.
Understanding USG Durock Cement Board
USG Durock is a versatile, cement-based board designed for use in both wet and dry areas. It's perfect for walls and floors, providing a stable base for ceramic, porcelain, and natural stone tiles. Here's what makes USG Durock stand out:
- Mold and mildew resistant
- Lightweight and easy to handle
- Reduces the need for additional framing
- Compliant with building codes and standards
Tools and Materials Needed
Before you start, gather these tools and materials:

- USG Durock cement board
- Thinset mortar
- Notched trowel (1/4" or 3/8")
- Straight edge or level
- Cement board screws (1-1/4" or 1-3/8")
- Drill with screwdriver bit
- Utility knife
- Measuring tape
- Chalk line
- Protective gear (gloves, safety glasses)
Preparation: Surface and Board
Before installation, ensure the surface is clean, dry, and structurally sound. Remove any old materials, and repair any damage. For walls, the surface should be flat and plumb. For floors, it should be level and structurally capable of supporting the tile installation.
Inspect your USG Durock boards for any damage. If necessary, cut boards to size using a utility knife and a straight edge. Always wear protective gear when cutting.
Installing USG Durock on Walls
Start at the bottom of the wall, and work your way up. Apply thinset mortar to the wall using a straight edge or level to ensure an even coat. Place the first board, pressing it firmly into the mortar.

Secure the board with cement board screws, spacing them no more than 6" apart along the edges and 12" apart in the field. Ensure screws are at least 1/8" from the board's edge and 1/2" from any cut edges.
Stagger joints between boards by at least 6". Apply thinset mortar to the top of the first board, and press the second board into it, securing it with screws. Continue this process until the wall is covered.
Installing USG Durock on Floors
Start at the center of the room, laying a full board. Work outwards, ensuring boards are staggered and joints are offset. Apply thinset mortar to the subfloor, and press the board into it. Secure the board with screws, following the same spacing guidelines as walls.
For floors, it's crucial to ensure the surface is level. Use a level to check the surface, and use shims if necessary to achieve a level surface.
Finishing Touches and Sealing
Once the installation is complete, apply a thin layer of thinset mortar over the joints and screw holes. Allow it to dry, then sand any rough edges. Clean the surface to remove any dust.
Before tiling, apply a cement board primer or sealer to the USG Durock surface. This will help prevent moisture from penetrating the boards and ensure a successful tile installation.
Conclusion
Installing USG Durock cement board is a straightforward process that requires the right tools, materials, and techniques. By following this guide, you'll create a solid, durable substrate for your tile installation. Happy tiling!