KDOT Smart Work Zones(SWZ) System
Description
This project will install ITS equipment and system that would leverage the information from the ITS equipment to improve operations within and around the work zones in the Wichita Metropolitan Planning Organization (WAMPO) area.
Status: Near Term
Timeframe: 0 to 2 years.
Stakeholders
Inventory
KDOT TOC (Wichita Metro) Maintenance and Construction System |
---|
KDOT TOC (Wichita Metro) Roadside Equipment |
---|
KDOT Traffic Operations Center (Wichita Metro) |
---|
Services
MC06–Work Zone Management (KDOT) |
---|
MC07–Work Zone Safety Monitoring (KDOT) |
---|
Interfaces
Source | Flow | Destination | Status |
---|
KDOT TOC (Wichita Metro) Maintenance and Construction System | roadway dynamic signage data | KDOT TOC (Wichita Metro) Roadside Equipment | Near Term |
---|
KDOT TOC (Wichita Metro) Maintenance and Construction System | video surveillance control | KDOT TOC (Wichita Metro) Roadside Equipment | Near Term |
---|
KDOT TOC (Wichita Metro) Maintenance and Construction System | work zone information | KDOT Traffic Operations Center (Wichita Metro) | Near Term |
---|
KDOT TOC (Wichita Metro) Maintenance and Construction System | work zone warning device control | KDOT TOC (Wichita Metro) Roadside Equipment | Near Term |
---|
KDOT TOC (Wichita Metro) Roadside Equipment | roadway advisory radio status | KDOT TOC (Wichita Metro) Maintenance and Construction System | Near Term |
---|
KDOT TOC (Wichita Metro) Roadside Equipment | roadway advisory radio status | KDOT Traffic Operations Center (Wichita Metro) | Near Term |
---|
KDOT TOC (Wichita Metro) Roadside Equipment | roadway dynamic signage status | KDOT Traffic Operations Center (Wichita Metro) | Near Term |
---|
KDOT TOC (Wichita Metro) Roadside Equipment | work zone warning status | KDOT TOC (Wichita Metro) Maintenance and Construction System | Near Term |
---|