KDOT Smart Work Zones(SWZ) System

Description

This project will install ITS equipment and system that would leverage the information from the ITS equipment to improve operations within and around the work zones in the Wichita Metropolitan Planning Organization (WAMPO) area.

Status: Near Term

Timeframe: 0 to 2 years.

Stakeholders

KDOT

Inventory

KDOT TOC (Wichita Metro) Maintenance and Construction System
KDOT TOC (Wichita Metro) Roadside Equipment
KDOT Traffic Operations Center (Wichita Metro)

Services

MC06–Work Zone Management (KDOT)
MC07–Work Zone Safety Monitoring (KDOT)

Interfaces

SourceFlowDestinationStatus
KDOT TOC (Wichita Metro) Maintenance and Construction Systemroadway dynamic signage dataKDOT TOC (Wichita Metro) Roadside EquipmentNear Term
KDOT TOC (Wichita Metro) Maintenance and Construction Systemvideo surveillance controlKDOT TOC (Wichita Metro) Roadside EquipmentNear Term
KDOT TOC (Wichita Metro) Maintenance and Construction Systemwork zone informationKDOT Traffic Operations Center (Wichita Metro)Near Term
KDOT TOC (Wichita Metro) Maintenance and Construction Systemwork zone warning device controlKDOT TOC (Wichita Metro) Roadside EquipmentNear Term
KDOT TOC (Wichita Metro) Roadside Equipmentroadway advisory radio statusKDOT TOC (Wichita Metro) Maintenance and Construction SystemNear Term
KDOT TOC (Wichita Metro) Roadside Equipmentroadway advisory radio statusKDOT Traffic Operations Center (Wichita Metro)Near Term
KDOT TOC (Wichita Metro) Roadside Equipmentroadway dynamic signage statusKDOT Traffic Operations Center (Wichita Metro)Near Term
KDOT TOC (Wichita Metro) Roadside Equipmentwork zone warning statusKDOT TOC (Wichita Metro) Maintenance and Construction SystemNear Term