Sedgwick County Fiber Optic Network
Description
Fiber Optic cable network installed to connect field devices with the Sedgwick County's traffic management center.
Status: Medium Term
Timeframe: 5 – 10 Years
Stakeholders
| Sedgwick County Public Works |
|---|
Inventory
| Sedgwick County Fiber Optic Cable Expansion |
|---|
| Sedgwick County Roadside Equipment |
|---|
| Wichita Traffic Operations Center |
|---|
Services
| TM03–Sedgwick County Traffic Signal Control |
|---|
| TM06–Traffic Information Dissemination (Sedgwick County) |
|---|
Interfaces
| Source | Flow | Destination | Status |
|---|
| Sedgwick County Roadside Equipment | right–of–way request notification | Wichita Traffic Operations Center | Long Term |
|---|
| Sedgwick County Roadside Equipment | roadway dynamic signage status | Wichita Traffic Operations Center | Long Term |
|---|
| Sedgwick County Roadside Equipment | signal control status | Wichita Traffic Operations Center | Long Term |
|---|
| Wichita Traffic Operations Center | roadway dynamic signage data | Sedgwick County Roadside Equipment | Long Term |
|---|
| Wichita Traffic Operations Center | signal control commands | Sedgwick County Roadside Equipment | Long Term |
|---|
| Wichita Traffic Operations Center | signal control plans | Sedgwick County Roadside Equipment | Long Term |
|---|
| Wichita Traffic Operations Center | video surveillance control | Sedgwick County Roadside Equipment | Long Term |
|---|