Installing a Delta 500 shower base sets the foundation for a safe, functional, and stylish shower renovation. This guide provides a clear, step-by-step process to ensure a professional-quality result, focusing on the critical requirements of the Delta 500 system.
Before beginning the delta 500 shower base installation, meticulous preparation is essential. You must confirm that the chosen base model matches your existing Delta rough-in valve and plumbing configuration. Collect all necessary tools, including a plumbing saw, level, utility knife, measuring tape, and a cordless drill. It is also vital to turn off the main water supply and drain any residual water from the pipes to prevent unexpected flooding during the process.
Understanding the Delta 500 System
The Delta 500 series is designed for versatility, fitting both standard and extra-wide shower framing. A key feature is the use of a universal wall flange, which allows for flexible positioning on the wall. During the delta 500 shower base installation, you must ensure the flange is set at the correct height, typically 5 feet 3 inches from the finished floor, to align perfectly with the valve body inside the wall.

Preparing the Subfloor and Area
A stable substrate is non-negotiable for a durable installation. The area beneath the shower base must be solid, flat, and able to support the weight of the base and water. If you are installing over plywood, ensure it is at least 1/2 inch thick and secured with screws. For concrete slabs, a self-leveling compound may be necessary to create a perfectly flat surface for the base to bond against.
Step-by-Step Installation Process
Begin the delta 500 shower base installation by dry-fitting the base into the framed area. Check for squareness by measuring diagonals; they must be equal. Mark the drain location precisely and cut the hole using a utility knife or a hole saw, ensuring the edges are smooth. Next, apply a continuous bead of polyurethane sealant around the drain and set the base into position, pressing firmly to create a watertight seal.
Once the base is seated, secure it with appropriate fasteners designed for the substrate. Attach the wall flange to the studs, ensuring it is level. Connect the Delta rough-in valve to the waste pipe, using the provided clamps to secure it tightly. Finally, test the system by turning the water back on slowly and checking for leaks around the valve connections and the base perimeter before proceeding to tile installation.

Critical Checks and Finishing Touches
After the main installation steps, perform a series of checks to guarantee longevity. Verify that the shower floor slopes gently toward the drain to prevent water pooling. Inspect the curb height to ensure it provides a safe transition into the shower area. Only after confirming these elements are correct should you apply the final silicone sealant and prepare the surface for tiling.