close
Friday, January 26, 2024

Electricity: We’re working to evacuate 30MW from Kashimbilla, says FG

The Kashimbilla hydropower plant has an installed capacity of 40 megawatts, but only 10 megawatts are being evacuated.

• January 25, 2024
Power Grid
Power Grid used to illustrate the story (Credit: Nigerian Guardian)

The federal government says plans are on to evacuate the dormant 30 megawatts (MW) in the Kashimbilla hydropower plant to the national grid.

The Kashimbilla hydropower plant has an installed capacity of 40 megawatts, but only 10 megawatts are being evacuated.

Power Minister Adebayo Adelabu said this while on an inspection tour of the power plant in Taraba State and the 56 Kilometre (km) and the 132 KiloVolt (KV) transmission line from Yandev to Makurdi in Benue State.

According to a statement by his media aide Bolaji Tunji, the minister said the Kashimbilla power plant, with its state-of-the-art technology, which includes Automated Tracking and Monitoring System (SCADA), was working effectively.

Mr Adelabu said that once the evacuation infrastructure is completed, the four turbines would evacuate the 40 megawatts effectively.

”We have begun the process, and we have the assurance of the contractors that this will be completed within the next six months to one year.

“The moment we are done with the evacuation infrastructure, the stranded 30 MW will be evacuated, and the four turbines will be working at full capacity of 10 megawatts each to make 40.

” And this will increase the generation capacity that will be evacuated into the national grid,” he said.

Mr Adelabu, who also visited the 132/33KV substation in Amua, Gboko Local Government Area of Benue, said the four turbines installed in the Kashimbilla power plant were working perfectly and generating 100 per cent of installed capacity.

The minister said the Kashimbilla project was in two phases, adding that phase one, which has been completed, includes 2×60 Mega Volt Ampere (MVA) substations in Takum and Wukari local government areas.

Mr Adelabu said it also includes a 2×7.5 MVA substation in the Donga Local Government Area of Taraba.

He said the project’s phase two includes the construction of the 56km transmission lines and the construction of 132/33KVA substation in Yandev, Benue, where the generated power will be wheeled to the national grid.

The minister, while expressing displeasure that 30 megawatts was stranded, said it was not in the country’s economic interest, hence the need to ensure accelerated completion of the evacuation.

”The project is in line with the ”Renewed Hope Agenda” of President Bola Tinubu in ensuring that electricity is taken to every nook and cranny of the country,” he added.

He said more efforts will be put in place to improve power generating capacity across the plants.

Also, Sule Abdulaziz, the managing director of Transmission Company of Nigeria (TCN), said efforts were on to ensure that the 132KV transmission line from Yandev to Apir in Makurdi is completed.

(NAN)

We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.

More from Peoples Gazette

Katsina State

Politics

Katsina youths pledge to deliver over 2 million votes to Atiku

“Katsina State is Atiku’s political base because it is his second home.”

Benue State Education Quality Assurance Agency (BSEQAA)

Education

Benue govt. orders refund of excess WAEC, NECO handling charges

He further directed all the schools to adhere strictly to the approved handling charges of N5,000 per student.

FRSC at an accident scene

States

One dies in Anambra road crash

“A total of 17 persons, comprising 13 male adults, four female adults were involved in the crash.”

Nigerian troops

States

Troops neutralise three suspected terrorists in Taraba

He said that the successful mission also resulted in the recovery of two AK-47 rifles.

Nigerian police officers used to illustrate the story

States

Families of deceased police officers receive N41 million in Jigawa

The insurance scheme was instituted to cater to the welfare of family members of deceased officers.

NDLEA officers

Lagos

Customs hand over 1,000kg illicit drugs to NDLEA in Lagos

The seizure was made possible through tracking of the containers based on credible intelligence from international partners.

Nigerian Police Force

States

Plateau: Police arrest 17 suspects over killings in Mangu, Bokkos

The PPRO assured that the suspects would be charged in court when the investigation is concluded.