close
Tuesday, September 24, 2024

FEC approves 14 road construction in flood-affected states

The Federal Executive Council approved the construction of 14 roads and bridges badly affected by floods in Ekiti State, Adamawa, Kebbi and Enugu.

• September 24, 2024
President Bola Tinubu
President Bola Tinubu

The Federal Executive Council approved the construction of 14 roads and bridges badly affected by floods in Ekiti State, Adamawa, Kebbi and Enugu.

Works minister David Umahi said this while addressing journalists after the FEC meeting.

He said the others are in Cross River, Ondo, Osun State, Ebonyi, Abia and Imo.

He said the roads were awarded, in addition to a contract for the repair and rehabilitation of Gamboru Bridge along Gambor-Ngala-Kala-Balge Road in Borno.

The minister said FEC also approved a new contract for the rehabilitation of Maraban-Kankara-Funtua Road in Katsina and the construction of 258km three-lane carriageway, a component of the 1,000 Sokoto-Badagry super-highway, Section 2, Phase 2A.

Likewise, he said FEC approved the contract for the construction and dualisation of Afikpo-Uturu-Okigwe Road in Ebonyi, Abia and Imo (Section 2).

He said FEC similarly approved the contract for Bodo-Bonny Road in Rivers, to be executed by Julius Berger.

“FEC approved an additional N80 billion to complete that project, bringing the total cost to N280 billion. The next is the Third Mainland Bridge, which was executed under emergency work,” he said.

He said the Third Mainland Bridge was a nightmare when the present government assumed office.

He explained that Julius Berger sought to review the entire project when he came on board.

“Don’t forget that the initial cost of the projects was N155 billion, and the past administration reviewed it to N797 billion. Berger insisted that the reviewed contract sum should be N1.5 trillion. We didn’t have that money, and the coordinating minister for the economy and myself went through the road and had a strategic meeting with Berger,” said Mr Umahi.

Mr Umahi said he eventually sought the approval of President Bola Tinubu to break the projects into three so that two sections could be done on tax credit and Julius Berger could do one.

The minister said that the FEC approved Julius Berger’s contract for a total contract sum of N740 billion. However, he said the other two were not presented for approval.

“If you remove approximately N400 billion paid by the last administration, then what is left is about N340 billion. That is what the contract sum for the 164km will be, and that’s what FEC approved today,” Mr Umahi said.

He added that the Lekki Deep Seaport road service lane was approved for construction by FEC.

Mr Umahi said over 3,000 fuel trucks queuing to the lift fuel at Dangote Refinery were all parked on the newly constructed Lekki-Calabar coastal highway.

“Technically and by design, the roads were never built for static loads, and so it has a lot of effects,” he said.

He said that the FEC approved the concession of the federal government land in the area so that concessioners could build a park.

“It’s a park that will be tolled so that all the trucks can safely park over there, and the pavement of such a park is quite different from the pavement of the road,” said Mr Umahi. 

(NAN)

We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.

More from Peoples Gazette

Katsina State

Politics

Katsina youths pledge to deliver over 2 million votes to Atiku

“Katsina State is Atiku’s political base because it is his second home.”

Antibiotic drugs

Uncategorized

Medical experts caution Nigerians against self-medication, antibiotics abuse

Medical experts have warned Nigerians about the dangers of self-medication and misuse of antibiotics in the human body.

Ryan W. Routh arrested

World

Would-be assassin offers $150,000 bounty for Trump’s assassination

“This was an assassination attempt on Donald Trump, but I failed you. I tried my best and gave it all the gumption I could muster,” Mr Routh said in a note.

Ahmad Al Aliwi Alissa

World

Colorado gunman sentenced to life imprisonment for killing 10 people

The convict’s unanimous guilty verdict by the jury came about six hours over two days before the judge found Mr Alissa guilty of murder.

Kebbi Governor, Nasir Idris

States

Kebbi begins fumigation against mosquitoes, reptiles

The exercise followed Governor Nasir Idris’ mandate to the ministry to cover all the local government areas to protect residents against malaria.

Climate change

Agriculture

Make COP29 decisive moment for climate action, expert urges

A global expert in Climate Governance and Policy has called on global leaders to make COP29 a decisive moment for global climate action.

Senate President, Godswill Akpabio (Credit: Akwa Ibom state government)

Politics

Okpebholo’s emergence as Edo governor-elect, milestone for APC: Akpabio

Senate President Godswill Akpabio has described the emergence of Monday Okpebholo as governor-elect of Edo as a milestone for APC.