FG begins reconstruction of collapsed Keffi flyover

The federal government has begun reconstruction of the collapsed Keffi flyover in Nasarawa State while accelerating major roadworks across the country.
Minister of works, Dave Umahi, disclosed this after Thursday’s federal executive council (FEC) meeting chaired by President Bola Tinubu.
Umahi described the July 4 collapse as “very unfortunate” and confirmed a settlement with the families of the three persons who lost their lives.
“We lost three lives there. We have settled with the families. They are not pressing charges. Reconstruction has commenced,” the minister stated.
He said one carriageway has been closed for urgent repairs, following structural assessments to prevent further hazards.
The Keffi flyover is a critical link between Abuja, Nasarawa and other parts of Nigeria’s North-Central region.
Mr Umahi added that FEC has approved funding and reviews for several key road and bridge projects nationwide.
He noted that 360 road rehabilitation projects were completed in 2023, and inspections are ongoing across all zones.
To enhance transparency, state engineering chambers will now help monitor federal road projects in their respective domains.
The minister listed several strategic projects, many exceeding ₦10 billion, that have either begun or received significant funding.
They include: Abuja Road Lot 1: 118 km at ₦275bn (30 per cent disbursed and completed); and Lot 2: 164 km at ₦502bn (₦150bn released for six sections).
Other priority projects are: Enugu–Onitsha Road: 72 km at ₦150bn (₦45bn released); Abuja–Kano Road: ₦220bn (30 per cent disbursed); and Bauchi–Jigawa Sections: Fully funded.
Also included is the Nembe–Brass Road: ₦156bn, with 30 per cent of funds already released.
The near-complete Port Harcourt–Bodo–Bonny Road spans 35 km and costs ₦200bn.
Further projects: Benin–Ifon–Akure Road: 108.4 km (30 per cent disbursed); Akure–Ado-Ekiti Road: 256 km at ₦761bn (30 per cent released).
Newly approved and revised projects include: Biu–Numa Road (Borno/Adamawa): Revised to ₦61.76bn from ₦15.4bn.
Maraba–Keffi Road (Nasarawa): Dualisation of 43.6 km at ₦76bn. Ikorodu–Sagamu Road (Lagos): ₦11.42bn variation approved for completion.
Also, Kashamu–Amshi–Guru–Gurus Road (Yobe): ₦23.4bn for binder courses and a new vehicle bridge.
Sokoto–Badagry Superhighway: Kebbi Section: 258 km x2 at ₦1.92tn; Sokoto Section: 120 km x2 at ₦912bn.
Further approvals include: Afe Babalola University Access Road (Ekiti): 14.4 km revised to ₦9.32bn due to funding gaps.
Trans-Saharan Highway (Oyo–Benue border): Extended from 180 km to 231.64 km. Revised cost: ₦445.8bn due to soil failures and realignment.
Lagos–Calabar Coastal Highway (Sections 4A and 4B in Ogun and Ondo): 80.35 km x2 at ₦1.65tn, including 6-metre swamp excavation.
Mr Umahi pledged to publish a comprehensive list of all ongoing and approved projects in the coming weeks.
(NAN)
We have recently deactivated our website's comment provider in favour of other channels of distribution and commentary. We encourage you to join the conversation on our stories via our Facebook, Twitter and other social media pages.
More from Peoples Gazette

Agriculture
FG tasks ECOWAS on leveraging financing strategies for agroecology
The federal government has urged stakeholders in the agriculture and finance sectors in the West Africa region to leverage financing strategies to enhance agroecology practices

Politics
Katsina youths pledge to deliver over 2 million votes to Atiku
“Katsina State is Atiku’s political base because it is his second home.”

Economy
Senate meets IGP Egbetokun over stolen crude oil in Niger Delta
Between 2002 and 2025, about 353 million barrels of crude oil were stolen from the Niger Delta, according to NUPRC.

Sport
Nigeria, others secure spot in FIBA World Cup qualifiers
Mali, Nigeria, Senegal, and South Sudan join a group of 24 national teams that will compete in four FIBA Women’s Basketball World Cup 2026 qualifying tournaments.

Africa
Zulum, Oborevwori, Uzodimma, Uba Sani nominated for 2025 African Governors Award
Other nominees are from Egypt and Kenya.

Hot news Home top
FCMB Group’s first-half 2025 earnings surge to N79 billion
FCMB Group remains focused on improving operational efficiency, expanding its digital and retail business, and continuing its strong earnings momentum.

NationWide
Visa Restrictions: NOA warns Nigerians about travelling to U.S.
“The United States applies strict screening to prevent security threats while supporting lawful travel under a fair and transparent visa process,” he said.

Abuja
NCC advocates legal use of software applications in engineering, building design
NCC director-general John Asein made the call during a sensitisation session on legal use of software in engineering, construction, and building design sectors